Case Studies

Shropshire -  The design for the mezzanine floor was looked at and it was agreed that is should be fit for purpose, while being accessible for deliveries, and to store products for the production team. EMS was involved in the final design and went ahead with the manufacture of the 201 square metre floor at their Wolverhampton fabrication works, and installation of the mezzanine floor with their own team. This included a staircase complete with double mid-landing.

 CS1 IMG_1781

 IMG_1756 IMG_1760

EMS are delighted to use this installation in Shropshire as one of their case studies and the agent is now going ahead with the fitting out of the rest of the building, and will be finishing the project in early 2015 with fire protection cladding to the mezzanine floor. It proves you can go up and around to save time and money… a great L-shaped Mezzanine Floor was the end result.

 

Wolverhampton – Crown Water Heaters – We were asked to look at an expanding local business through an agent, and designed and installed a new 103 square metre mezzanine floor with a pallet gate and stairs. This has given an increase in storage space for Crown, who now plan to store their stock of water heaters on there, giving them more space to sort and pack on the ground floor.

IMG_1790 IMG_1799a

IMG_1791 IMG_1798a

Crown Water Heaters are looking to expand their business after this installation, and are situated near Codsall, Wolverhampton http://www.crownwaterheaters.co.uk/ and supply into local authorities and housing associations, as well as pharmacies and surgeries. A great mezzanine floor with a 70% increase in space, and a good edition for one of our case studies.